The program includes separate Laboratories dedicated to different modalities of testing (nasal swab and saliva testing), served by shared spaces for Offices, Lockers, Toilets, Conference Room, Sample Receiving/Triage, Clean Storage, Soiled Holding.
Lab furnishings were designed for flexibility, with the understanding that they will be reconfigured as testing needs and technologies develop. The project included two new rooftop HVAC systems including air handlers, exhaust fan sets, and energy recovery units. The team worked closely in an integrated process with the Hospital, their lab equipment Vendors, and HSC Construction Managers to program, design, document, and construct this critical facility in a short time span.